Wednesday Workings, September 23, 2026


I had a bunch of scraps from Katydid that I was putting away.  It came to me to make a charity quilt.  Since many of the scraps were large enough for a 5" square and 5" x 2.5" wide to put together and shimmy down to 5".  The inner border and outter border also scraps.  Now it will be up to Lorna to find a suitable back in the charity stash that Sunshine has collected.

I pulled fabrics and started in on the cutting of Popsicles.  This is one from the 2026 UFO list.  A simple table runner with a twist.  I will be working on stitching this project today.

I will be trying to listen to a book (The Alice Network) while sewing, but the Blue Angels are out practicing for the show being held this weekend in San Diego.  There will be lots of pauses...

Happy Wednesday =^.^=



Design Wall Monday, September 21, 2026

 



Teddy Bear blocks continue to be my hand stitching project in the evenings.  The one on the slide finished and the one with the bear doing a cartwheel started soon afterward.  There are only two more blocks to go.

I am about to start into the UFOs again.  Popicles will be the first.  It is a 2026 UFO.  I like the way the popicles dance on this table runner.  My stash should have all the fabric needed for this summertime table runner.

Owls and Pumpkins was inspired to make for my great nephew Greyson.  He had a liking for owls when he was a couple of years younger.  This is a 2023 UFO that he probably has no interest in anymore.  I plan to make it anyway.

That's all folks =^.^=

Sunday Stash Report, September 20, 2026

 

Katydid is complete.  Thanks to everyone who pointed out a wrong twist of a unit.  This project is full of hour glass units along with the busy fabrics.  It was crazy difficult to see a mistake had been made.  I'll be putting together a backing today.  I have to piece a backing so it will be fun coming up with it using a three yard piece of Halloween novelty and 10" squares.  Maybe the extra made hour glass units (24) will find a place too.


This is the one add for the week past.  You can see it has already been used and might used again in the backing.  On Friday I was able to finish the scrappy black binding.  I look forward to using it when Katydid has made it's round trip to Kerry's.  My next Bonnie Hunter project will be her annual Winter Mystery!


On Friday as well I started in on Witches Feet Table Runner by Block Party Quilt Company.  I had previously made Elf Feet Christmas Table Runner from this same company and adore it.  Both complete kits were had during a Road to California Quilt Show.  There are other table runners and projects easy to pick up and sew if you want something quick to work on.  Witches Feet has binding in the flying geese print and a spider web white/gray backing.


This September BOM coordinated by Teresa for Sunshine Quilt Guild was finished last week.  It is the last completion for the week.  It was a very satisfying week.  Below is my Stash Report for this week.  =^.^=

Used this week: 17.25 yards
Used YTD: 225.25 yards 
Purchased this week: 2 yards
Purchased YTD: 58 yards
Net used in 2026: 167.25 yards

Wednesday Workings, September 16, 2026


I didn't get through to the last border because I ran out of the orange fabric scrap that was in the plan to use.  I was short a 5" x WOF strip.  Not a thing in my stash appealed.  There will be at least one purchase at Rosie's this week.  I do like what is going on with the borders so far on Katydid.  OOPs...it was just brought to my attention that two hour glass units in the pieced border are oriented the wrong direction.  OMG...this is a busy quilt.  I have had to go back and reorient more than I'd like to admit =^.^=


Plans to sew Sunshine's September BOM coordinated by Teresa is on my machine for today.  I will probably also start cutting Popsicles that is a 2026 UFO.  Time now to hunker down on what's left on my list.


Teddy Bear 8 was finished and I am onto Teddy Bear 9.  That's it for me today.  Have a great Hump Day =^.^=


Design Wall Monday, September 14, 2026


I am very excited about Katydid.  I have the middle and pieced first border all sewn together.  On the right are the fabrics for the next three borders.  The first two are small in width and the outside border will finish at 5".  I am getting very close to a finish =^.^=

I will be starting the hunt for a backing next.  My next sewing project will be back off the 2026 UFO list.  I am determined to complete all 12 by the end of the year.

Have a wonderful Monday.

Sunday Stash Report, September 13, 2026


Flutter finished and is on its way to Maryland.  This cute butterfly quilt has a very pretty light pink quilting design that finishes the perfect look.  The solid pink binding worked out well to break up the white background.  If you look closely it isn't just a white background.

I got back to work on Katydid after finishing Flutter.  I read the instructions wrong and made twice the hour glass units that are required.  Guess I'll have a fun strip down the backing or across the sleeve.


Combined with these strip sets they will make up the pieced first border.  I love all the variety!



Going to have to figure out what's going on with my iPad camera.  URGH!  These units will come together along with the second photo.  You get the design right?  In between opening NFL season and dinner I sewed the blocks together and the pieced border through the day.

So for my stash this week Flutter completed and I stayed out of quilt shops =^.^=

Used this week: 8.5 yards
Used YTD: 208 yards 
Purchased this week: 0 yards
Purchased YTD: 56 yards
Net used in 2026: 152 yards


Wednesday Workings, September 10, 2026


I have the Block As done correctly now.  Just before leaving for the visit with my parents I noticed all of them being sewn incorrectly.  I along with Kerry tried to figure out what was wrong with the arrangement of the two block designs and couldn't come up with it.  Then it hit me about Block A not sewn correctly that was causing lots of issues with the arrangement.  I had time to put a few of the blocks right and then I had to stop and pack.

When you deconstruct a nine patch block (or any block) it takes the seam ripper and then pulling out the useless threads.  Those useless threads are tough to remove when you sew the units back together.  The seam ripper part was done before getting in the car to travel to the airport.  I pulled all the threads out during my flight and a little more during my ride with Karen to my parents home.

I waited until I was back home to sew the units back together.  Now I have the Block As arranged once again with the Block Bs.  I have moved a few of the blocks around to balance out the colors and patterns of this very busy project (Spider & The Fly, Bonnie Hunter).  Next up will be sewing these blocks and rows together.  I'm ready to go with the next step; one of the borders.  No more problems and Katydid should be into a complete top.  See what I can do between now and Sunday's post.

Happy Wednesday!

Wednesday Workings, August 26, 2026


Introducing Kordia Krunch!  This one of Bonnie Hunter's design Cherry Crunch used a lot of scraps.  The only part not scrappy is the inner boarder, backing and binding.  Did you know that Kordia is a type of cherry?


I also finished mom's third table runner made for her from her stash.

Flutter top finished.  The back is a pink and white check.  Its binding will be a solid pink.  I will have the binding, sleeve, and label with me in Maryland.  Kerry should receive it late Thursday for the quilting.  We are thinking some kind of flower or butterfly or possibly a combination of the two in white or pale pink thread.  She will mail it to me in Maryland so I can finish it up for Me-Maw to gift.


If that wasn't enough the 24 B Blocks of Katydid are finished.  Next up will be the one pieced border.  It is the first border out from the middle.  Katydid is a type of insect if you didn't already know.  That insect makes a very loud night sound!

Hope your week has been good so far and the rest of it better =^.^=




Design Wall Monday, August 24, 2026

 


Katydid is moving along.  I cut the fabric for the second of the units B Block.  Between the two sewing days last week I was able to sew and cut into the 3.5" units (pictured in the center).  The last unit needed is the black/gray hour glass units (pictured on left).  Sunday evening I wiggled in time to stitch the hour glass units.  I also was excited to see a B Block sewn together.  I am loving this project.

There is still a pieced border of neutral/black that brings all these hour glass units together.  Yes it did turn into a Halloween project =^.^=



It is not a great photo of Flutter, but this is what is on my Design Wall (Katydid is on my sewing table).  The butterflies have been arranged a bit since I last showed a potential layout.  Time to sew the large 13.5" blocks together and attach the borders.  The pink check is to be the backing and the solid pink the binding.  I have an agreed upon label...time to finish this project up and get it to Kerry.  I am shooting for Tuesday at USPS!

Sunday Stash Report, August 23, 2026

 



Two more Teddy Bears are finished.  There are five more to stitch that I will be tackling on the plane.  These are easy to work on and will consume much of the 10 hours flight time to and from my parents.


Stash enhancements from Rosie's for the commissioned Flutter project.  The pink check will be for the back and the two on the right are for the main wings of the last two butterflies.


The best purchase was the replacement Creative Grids ruler.  I sure did miss this ruler size from the most unfortunate Accuquilt cutter debacle.

Two projects arrived from Kerry YEAH!  Kordia Krunch is one of them.  The fabric at the top right is the backing and sleeve.  I'll be looking for enough solid red to bind it with.  I'm hopeful that there will be something from my stash.

The third and last (for now) table runner is ready to bind and label.  It will be heading to mom in a package with lots of other goodies early this week.

So for now I have just three yards to add that will soon be counted in the used stats.  Have a wonderful Sunday.

Used this week: 0 yards
Used YTD: 199.5 yards 
Purchased this week: 3 yards
Purchased YTD: 56 yards
Net used in 2026: 143.5 yards

Wednesday Workings, August 19, 2026


I have Flutter as far as it can go until fabric arrives in the mail.  ETSY is bringing me a blue print and Kerry is sending me two red prints.  Sure hope the fabrics work when they get here.  I am likely going to use a pink for the binding.  There should be enough of the background for the back.  I would like to have Flutter off to Kerry for quilting before I leave on my flight next week.

The B Block is next to build on Katydid.  First come 25 sets of 4 HSTs.  


These oranges will make the second part of B Block.  I will be cutting these tonight.  The black and white fabrics are already downstairs on the table waiting for the oranges.  I have two sewing days this week on Friday and Saturday.  My goal is to have all the units cut and start in on the sewing so that the B Blocks will come together.

Hope your Wednesday is going well.



Design Wall Monday, August 17, 2026


I kept working on Flutter Sunday afternoon even though it was pretty chaotic around here.  There was a fire started around 1:30pm that was moving slowly towards the East until it wasn't.  We were inside the Evacuation Order - Set for most of the day.  San Diego Fire Department finally gave the all clear around 8:30pm except for one zone not close to us.  The Sorrento Fire spread to 131 acres.  There were five fixed planes and three helicopters working the blaze.  At 8:30pm Sunday it was 25% contained.  Can't wait for the smokey smell to dissipate =^.^=

So back to Flutter.  These are the pieces needed for the project.  There will be eight butterflies.  I still need a three more flower prints for the upper wings.  I have plenty of lower wings and body fabrics for whatever I can find.  I'd really like a blue, purple and maybe a red or pink floral.  I've made all the nine patches, but may change my mind on the focus fabric.  Right now it is a stripe that picks up the butterfly colors.  I am thinking it doesn't make enough of an impact.  Easy enough to change to something different at this point.

So what's on your Design Wall?


Sunday Stash Report, August 16, 2026


This is a 2026 UFO finish!  Kerry and I took the workshop Confetti by Jemina Flendt at Road to California this year.  This was the project using the pattern When Perfect Isn't the Point.  I used the scraps mainly from two projects and Pam helped me out from one project that we both made.  Neither project had much black so I added in a bit more that worked well with the other scraps.

Which name do you like better Krinkle or Krimped?  Crinkle is the name of the paper you find in shipping boxes.  Crimped is the process that paper goes through to make it crinkle.

I'm thinking Krinkle sounds "holidayish".  Surprised I never thought to use it for a Christmas project.  Crimped sort of works as it is all the leftover fabric from three different projects.  I would use Konfetti, but it has already been used on another of my projects.  I'll wait for your help...don't let me down =^.^=

This week I will claim for the yardage it takes to build this 60" by 60" project.  Nothing purchased this week.  Next up in the sewing queue is Flutter.

Used this week: 12.75 yards
Used YTD: 199.5 yards 
Purchased this week: 0 yards
Purchased YTD: 53 yards
Net used in 2026: 146.5 yards

Wednesday Workings, August 12, 2026

 

Joe's Ties quilt is complete.  It took me awhile, but all the colar buttons are in place and the label is secure.  I'll be mailing this one to it's new owner to hold for her son until Christmas.


Mom's table runner 2 is done.  There is one more to go that Kerry will likely have back to me soon.  These have been fun to make.  Possibly more are coming as I do my best to use up her stash.

I spent most of Tuesday on the computer and when evening came buttons...buttons...buttons.  By the end of the evening only half way through the tiny 24 colar buttons.  The rest were done after aqua fit.  I'll soon be in my Sewing Room putting the Block As together of Katydid (Spider & The Fly).

Happy Wednesday =^.^=


Design Wall Monday, August 10, 2026


I need to make sure the arrangements of the blocks look good before sewing them together.  I started Monday with not all 25 Block As cut or sewn.


I had a lot of it quite far along.  A few more units yet to be done.


The last units kept me busy today.

I will be finishing up my two latest hand sewing projects later after dinner if the hubby decides to watch something I don't prefer =^.^=


Sunday Stash Report, August 9, 2026

 

I met up with my sewing friends on Thursday and Friday at Rosie's this past week.  I picked up two 1/4 yards of fabric for Spider & the Fly project.  I should have waited until Friday because all the Halloween fabrics were on sale.  Not a big discount since this purchase only ended up to be 1/2 yard total.  My project is going along briskly.  I'm deep into the 25 Block As.  My project is using mostly white/black as the backgrounds.  It isn't necessarily a Halloween quilt, but the colors lean towards that theme.



These came home with me too.  They are all for the butterfly/flower quilt called Flutter that I have commissioned to make.  Pretty excited by the background fabric.  I will be working on this one after my Spider & the Fly Block As are done.

I did look at Rosie's for the 6 1/2 x 12 1/2 Creative Grids ruler to replace my oops with the Accuquilt cutter.  She has them on order and I am slated to get one when the three arrive.  I need this ruler =^.^=

I did finish the tie quilt's binding.  I have buttons to add to the colars yet.  Mon's table runner 2 is nearly bound; just one long side to go.  Until next time.

Used this week: 0 yards
Used YTD: 186.75 yards 
Purchased this week: 9.5 yards
Purchased YTD: 53 yards
Net used in 2026: 133.75 yards



Wednesday Workings, August 5, 2026



I was able to get the fabric needed for Kommitted.  No thanks to Kassy (one of my kitties), I was able to finish the binding.  I'm happy to use both my mom's and my stash with Kommitted.  I am finally starting to see a small dent in my neutrals!


I trimmed down Mom's Table Runner 2 and the Tie quilt ready to add the binding.  One binding is ready to go and the other needs to be prepared.  


In the meantime I have been working on Spider & The Fly.  Cutting units and sewing the many hour glass units.  This is a fun block unit that I enjoy making.  I have block units sewn for two blocks right now.  I will sew together when I have more so that the fabric mixes are the most pleasing.  

I skipped Aqua Fit today to give my toe more time to heal from my stumble on Friday night.  I found out running into a chair leg in the middle of the night can break a toe.  I was at the doctor's office yesterday and brought up my very bruised toe.  She sent me to get xrays.  Turns out that my middle toe is fractured.  Not much can be done except to keep weight off and tape.  I haven't taped, but as I said time to keep activity level and leg propped up for a few days.  

Enjoy your Wednesday