The quilts that are back from Kerry. These are the first to have the binding stitched in place ready for hand sewing. Aren't they going to put a smile on a child's face. Project Linus is the destination for these. The one on the right is glow in the dark fabric. How fun will that be for a child as he falls off into dreamland. Mom put these together when she was at the quilting retreat we attend in May.
These two are waiting for their turn. The top one will be a donation to the Veterans Home. Not sure what will happen with the red and white quilt. Kerry has another four to finish. It is possible to get them before my trip. The plane takes off on Thursday with me aboard!
As for stash this 35th week of 2016.
Used this week: 25.25 yards
Used YTD: 146.25 yards
Purchased this week: 0 yards
Purchased YTD: 87.5 yards
Net used in 2016: 58.75 yards
Kalvery finished and it is a big project that you'll notice from my statistics. Hope you had or soon will have a finish! See others using their fabrics through the links at Patchwork Times.
2 comments:
That is a definite dent in your numbers! Congratulations! And I love the 3 quilts with binding already attached. There are some very lucky kids who will love and cherish them! I can't wait to see the other 2 unfurled...I do hope you'll show them to us when you are ready. Great job Mom and Daughter!
Great usage numbers. I like all 3 of the kids quilts and waiting to see the big one coming up. Have fun on your trip.
Post a Comment