Design Wall Monday, January 12, 2026

 

Scatter Garden covers my design wall today.  I am working on the last four blocks that have some applique in them.  There was an alternate star instead of one with the applique, but the applique block was call out to be done.  I will have progress to share on my Working Wednesday post.


This was the last part released and the reveal.  Oh my this quilt is lovely.  These pieces make the block you see above.  Putting this one together shouldn't take too long.  I need to decide if one of the four ice blue fabrics will work for the inner border or if I should look for something else on Friday when it's a Rosie's day.


Sunday Stash Report, January 11, 2026


Let's us start out with the second finish of the year.  Home for the Holly Days a 2026 UFO is ready for quilting.  I like how this medallion quilt looks.  I did work it all the way through with scraps from previous month's deliveries.  The only one I will need is the last one that contains the binding fabric.  Of course I need to come up with a "K" name.  Working on this =^.^=

There was so much fabric left from the Home for the Holly Days project and Katniss (Garnets & Lillies) that I decided to use all up for the When Perfect Isn't the Point workshop.  The Confetti pattern takes 288 3.5" by 6.6" prints and background; should be easy to get that from what's left.  The workshop is next week so I'm getting ready.

Scatter Garden and Lupine & Laughter are under the needle and on the design wall.  I'm most anxious to get Scatter Garden in the "prep" phase on the last four blocks that all have applique units.  These two are on the UFO list along with Confetti.  Drop back in tomorrow to see progress on my projects.

Another finish to account for this week in Home for the Holly Days!

Used this week: 21.5 yards
Used YTD: 37.25 yards 
Purchased this week: 0 yards
Purchased YTD: 0 yards
Net used in 2026: 37.25 yards

Wednesday Workings, January 7, 2026


Home for the Holly Days is on the Design Wall.  I have yet to sew the blocks together surrounding the middle, but it isn't far from being under the needle.


The snowballs that make the outside border are all finished and ready for their turn.  The inner border, same as the background fabric, is cut and ready to be measured out.  This project just might be done to a top before the week is out.  I have the back ready too.  Now I just need a clever name.


Installment 4 is done for Scatter Garden.  The instructions call for the top piece of each block to wait before sewing.  I spent the day taking apart and resewing the block on the upper left.  Silly me had the star units that make up the flower stitched the wrong way.  So happy to have caught the mistake now.

My sewing is making me happy =^.^=